Town of Ridgway Stormwater Master Plan

Allison Road Corridor and Rio Puerco Bridge Replacement

Location: Gallup, New Mexico

ACEC-NM Engineering Excellence Award Winner

The replacement of the Allison Road Rio Puerco Bridge and corresponding road connections is the first phase of improvements of the multi-phase $42 million Allison Road Corridor project. The overall project mitigates existing geometric, physical, and operational deficiencies; improves safety; and provides system connectivity. It will make vast improvements to the transportation network for the City of Gallup and the I-40 corridor with the goal of promoting commercial development and facilitating economic growth in the Gallup area. BHI provided a safety study to evaluate intersections near the BNSF railway and investigated a new north/south route across I-40 to select an optimal route for a potential new interchange. BHI also provided alignment evaluations, structural design of the bridge, traffic modeling and evaluation, drainage analysis, environmental investigations, utility coordination, geotechnical investigation, right-of-way review, construction management and inspection, agency coordination, and public involvement.

< Back to project list

Filed Under: Construction, Structures, Transportation, Water Resources

Get In Touch

Albuquerque Office

Address: 7500 Jefferson St. NE | Albuquerque NM, 87109

Phone:505.823.1000

Email: Email us here.

 

Denver Office

Address: Meridian One 9785 Maroon Circle, Suite 140 | Englewood CO, 80112-5928

Phone:303.799.5103

Email: Email us here.

 

Las Cruces Office

Address: 425 South Telshor Blvd. Suite C-103 | Las Cruces NM, 88011

Phone:575.532.8670

Email: Email us here.

 

Logins

  • RFQ/DBE
  • BHITracker
  • Employees


© Bohannan Huston, Inc. All rights reserved.