Top Menu
  • Home
  • Project Summary
  • Project Team
  • Project Information
  • Ridgway SWMP

Town of Ridgway Stormwater Master Plan

Black Arroyo Trail

Location: Rio Rancho, New Mexico

The Black Arroyo Trail was completed as the second phase of a recreational and wildlife habitat protection project that also stabilizes a highly erosive arroyo. The multi-use pedestrian and bicycle path provides regional connectivity and multi-modal access for surrounding neighborhoods, limits impacts to environmentally sensitive areas, provides educational opportunities through informational signage and features along the trail, and minimizes impacts to the natural topography of the area as it winds through desert sage brush and natural arroyos. As part of the project, BHI designed the trail and a prefabricated elevated pedestrian bridge over the Black Arroyo. The main drainage feature was a large gabion grade control/arroyo bank stabilization structure near the bridge.

< Back to project list

Filed Under: Construction, Structures, Water Resources

Get In Touch

Albuquerque Office

Address: 7500 Jefferson St. NE | Albuquerque NM, 87109

Phone:505.823.1000

Email: Email us here.

 

Denver Office

Address: Meridian One 9785 Maroon Circle, Suite 140 | Englewood CO, 80112-5928

Phone:303.799.5103

Email: Email us here.

 

Las Cruces Office

Address: 425 South Telshor Blvd. Suite C-103 | Las Cruces NM, 88011

Phone:575.532.8670

Email: Email us here.

 

Logins

  • RFQ/DBE
  • BHITracker
  • Employees


© Bohannan Huston, Inc. All rights reserved.