Top Menu
  • Home
  • Project Summary
  • Project Team
  • Project Information
  • Ridgway SWMP

Town of Ridgway Stormwater Master Plan

Grant County Airport

Location: Grant County, New Mexico

The Runway 8-26 Rehabilitation project at the Grant County/Silver City Airport was a successful endeavor due to the strong collaborative effort between Grant County, BHI, and the contractor. Through this collaborative effort and a temporary closure, the contractor produced and laid 12,000 tons of hot mix asphalt pavement in only 5 laydown days while cold milling 75,580 square yards of pavement at the same time. The resulting mill and overlay rehabilitated a 20+ year old pavement surface that was failing due to factors such as rutting and pavement raveling, as well as severe block cracking and surface oxidation. The fast-track construction required full-time construction observation and acceptance testing to ensure the construction met rigorous FAA construction technical requirements. The project was completed in just 2 weeks, which is extremely compressed compared to the original 75-day schedule that was approved by the FAA.

< Back to project list

Filed Under: Aviation, Municipal Infrastructure, Survey, Transportation

Get In Touch

Albuquerque Office

Address: 7500 Jefferson St. NE | Albuquerque NM, 87109

Phone:505.823.1000

Email: Email us here.

 

Denver Office

Address: Meridian One 9785 Maroon Circle, Suite 140 | Englewood CO, 80112-5928

Phone:303.799.5103

Email: Email us here.

 

Las Cruces Office

Address: 425 South Telshor Blvd. Suite C-103 | Las Cruces NM, 88011

Phone:575.532.8670

Email: Email us here.

 

Logins

  • RFQ/DBE
  • BHITracker
  • Employees


© Bohannan Huston, Inc. All rights reserved.