Town of Ridgway Stormwater Master Plan

Manitou Springs Flood Control Master Plan

Location: Manitou Springs, Colorado

With funding from a DOLA CDBG-DR grant, the BHI team completed the Manitou Springs Flood Control Master Plan. The plan includes prioritized flood control and restoration concepts with recommendations for drainage management improvements. These concepts will be a guide for critical watershed system improvements that build resilience in the Manitou Springs portion of the Fountain Creek Watershed.

BHI performed site investigation, field survey, and hydrologic and hydraulic analysis, and created detailed models for Ruxton, Sutherland, and Fountain Creeks, and Becker’s Lane Tributary. The hydrologic analysis refined the Upper Fountain Creek watershed by subdividing local basins to create a more detailed, useful model. Hydraulic analysis was performed for the creeks and the major storm drain systems to identify existing capacity constraints. Recommendations for improvements, stormwater quality BMPs, and wildlife habitat restoration efforts were developed and prioritized for the final master plan.

< Back to project list

Filed Under: Colorado, Water Resources Tagged With: Colorado, Drainage, Engineering, Flood Control, Manitou Springs

Get In Touch

Albuquerque Office

Address: 7500 Jefferson St. NE | Albuquerque NM, 87109

Phone:505.823.1000

Email: Email us here.

 

Denver Office

Address: Meridian One 9785 Maroon Circle, Suite 140 | Englewood CO, 80112-5928

Phone:303.799.5103

Email: Email us here.

 

Las Cruces Office

Address: 425 South Telshor Blvd. Suite C-103 | Las Cruces NM, 88011

Phone:575.532.8670

Email: Email us here.

 

Logins

  • RFQ/DBE
  • BHITracker
  • Employees


© Bohannan Huston, Inc. All rights reserved.