Top Menu
  • Home
  • Project Summary
  • Project Team
  • Project Information
  • Ridgway SWMP

Town of Ridgway Stormwater Master Plan

New Booster Station at Tank 8

Location: Rio Rancho, New Mexico

ACEC-NM Engineering Excellence Award Winner

The new 1,650 GPM Booster Station at Tank 8 is a critical piece of infrastructure within the City of Rio Rancho’s water distribution system. The new booster station replaces deficient infrastructure, provides a reliable water source and connectivity for the customers in the region, and supports future growth. BHI analyzed different facility and operational configurations as well as designed the booster station including the electrical and instrumentation components, along with 2.6 miles of waterline, and provided construction administration and observation support. The project was delivered within 30 days of the original schedule and was below the City of Rio Rancho’s original budget. BHI provided innovative solutions to reduce the footprint of the building and facilitate maintenance.

< Back to project list

Filed Under: Construction, Water Resources

Get In Touch

Albuquerque Office

Address: 7500 Jefferson St. NE | Albuquerque NM, 87109

Phone:505.823.1000

Email: Email us here.

 

Denver Office

Address: Meridian One 9785 Maroon Circle, Suite 140 | Englewood CO, 80112-5928

Phone:303.799.5103

Email: Email us here.

 

Las Cruces Office

Address: 425 South Telshor Blvd. Suite C-103 | Las Cruces NM, 88011

Phone:575.532.8670

Email: Email us here.

 

Logins

  • RFQ/DBE
  • BHITracker
  • Employees


© Bohannan Huston, Inc. All rights reserved.