Top Menu
  • Home
  • Project Summary
  • Project Team
  • Project Information
  • Ridgway SWMP

Town of Ridgway Stormwater Master Plan

Paseo Del Norte/I-25 Interchange Reconstruction

Location: Albuquerque, New Mexico

Teamed with Kiewit, BHI was the lead design firm for the design-build reconstruction of this over-capacity interchange in Albuquerque. This partial reconstruction added free-flow ramps for the two most congested movements, including a signature flyover from northbound I-25 to westbound Paseo del Norte Blvd. On a rapidly accelerated pace, BHI implemented a range of creative engineering approaches to optimize the conceptual design to realize the best value to the community for the $75 million budget. For example, realigning the original flyover design cut the structure length by 41%, improved functionality, reduced environmental impacts, and minimized the maintenance footprint.

< Back to project list

Filed Under: Design Build, Images Plus, Municipal Infrastructure, Planning, Structures, Survey, Transportation, Water Resources

Get In Touch

Albuquerque Office

Address: 7500 Jefferson St. NE | Albuquerque NM, 87109

Phone:505.823.1000

Email: Email us here.

 

Denver Office

Address: Meridian One 9785 Maroon Circle, Suite 140 | Englewood CO, 80112-5928

Phone:303.799.5103

Email: Email us here.

 

Las Cruces Office

Address: 425 South Telshor Blvd. Suite C-103 | Las Cruces NM, 88011

Phone:575.532.8670

Email: Email us here.

 

Logins

  • RFQ/DBE
  • BHITracker
  • Employees


© Bohannan Huston, Inc. All rights reserved.