SANTA ANA PUEBLO ARSENIC TREATMENT FACILITY

Location: Pueblo of Santa Ana Reservation, New Mexico

Arsenic contanimant levels had historically exceeded the mandated federal criteria within the Pueblo’s two drinking water wells east of I-25. Working with the Pueblo, IHS needed to correct the deficiency to comply with the Drinking Water Standards as soon as possible. Bohannan Huston was contracted to perform a PER for the Pueblo, followed by design and construction of the recommended improvements. Our construction administration team was responsible for managing onsite inspection and project management, construction document coordination, various progress meetings, milestone inspections and close coordination with the Contractor’s supervisor for testing and commissioning. Final closeout efforts included final punch list, warranty documentation, as-builts and O&M manual preparation.

< Back to project list

Filed Under: Construction, Municipal Infrastructure, Water Resources

Get In Touch

Albuquerque Office

Address: 7500 Jefferson St. NE | Albuquerque NM, 87109

Phone:505.823.1000

Email: Email us here.

 

Denver Office

Address: Meridian One 9785 Maroon Circle, Suite 140 | Englewood CO, 80112-5928

Phone:303.799.5103

Email: Email us here.

 

Las Cruces Office

Address: 425 South Telshor Blvd. Suite C-103 | Las Cruces NM, 88011

Phone:575.532.8670

Email: Email us here.

 

Logins

  • RFQ/DBE
  • BHITracker
  • Employees


© Bohannan Huston, Inc. All rights reserved.