Willow Creek Maintenance

Location: Lone Tree, Colorado

BHI provided engineering services to mitigate over 4’ of scour and erosion at the outlet of the double barrel 120” corrugated metal pipe (CMP) crossing along Willow Creek at Maximus Drive in Lone Tree, Colorado. Willow Creek is a sandy drainage way characterized by highly erodible soils. With development on each side, it was critical that scour be addressed along with bank degradation downstream of the existing CMP crossing.

BHI reviewed existing data and assessed the site conditions. To develop repair alternatives, a HEC-RAS hydraulic model analysis of the existing outlet and downstream channel was completed and a zero-rise floodplain certification was prepared. After conceptual design, the alternatives were ranked based on cost, safety, sustainability, and feasibility. BHI’s unique broken-back culvert extension was selected as the best option for the site, topography, safety, and for cost effectiveness. The culvert extension included a downstream stilling basin consistent with UDFCD criteria and provided a nationwide permit from the USACE for construction.

< Back to project list

Filed Under: Colorado, Water Resources

Get In Touch

Albuquerque Office

Address: 7500 Jefferson St. NE | Albuquerque NM, 87109

Phone:505.823.1000

Email: Email us here.

 

Denver Office

Address: Meridian One 9785 Maroon Circle, Suite 140 | Englewood CO, 80112-5928

Phone:303.799.5103

Email: Email us here.

 

Las Cruces Office

Address: 425 South Telshor Blvd. Suite C-103 | Las Cruces NM, 88011

Phone:575.532.8670

Email: Email us here.

 

Logins

  • RFQ/DBE
  • BHITracker
  • Employees


© Bohannan Huston, Inc. All rights reserved.